Wednesday, July 7, 2010

Day 324: 2nd down

More work on the Olive set tonight.  The epoxy on the inside was cleaned up and then the inside was sanded and a coat of oil applied.











I then turned it around, mounted it on my vacuum chuck, and finished the bottom.  This required yet another application of epoxy and coffee grounds.

Overall this piece is 11 1/4" diameter and 4 3/8" tall with a foot approx 2 1/2" diameter.  One more piece left to finish in this set.

No comments:

Post a Comment